An island-mode energy project designed to deliver contracted capacity blocks and metered powered space—built for uptime, predictable pricing, and operational clarity.
The site · Cottle County, Texas
The figures an energy partner checks first, in one view: land, water, the electrical lines on the property and the status of the natural-gas supply for the on-site generation plant.
Site plan · schematic
340 kV transmission line240 V linePlanned gas lineWater
Land
320 acres
≈ 129.5 ha · 0.5 sq mi
Cottle County, Texas
Water
1,200 gal/min
≈ 272 m³/h · ≈ 1.73 million gal/day
Total supply, available for cooling
Power lines
2 lines on site
340 kV high-voltage · 240 V
Transmission line crosses the property
Natural gas
In planning
Pipeline connection to the site
Coordinated with a gas utility
Utility readiness
4 of 5 on site · gas connection in planning
Water capacity
Available for cooling and site operations, ≈ 272 m³ per hour.
Source: Cottleone site data · Status: November 2026. The site plan is schematic and not to scale; positions of lines and zones are illustrative. Survey, utility drawings and capacity documents are provided in the data room.
The facility generates power on-site and distributes it through a central medium-voltage switchgear lineup to defined load zones. This reduces dependence on the public grid and makes delivered capacity predictable—critical for long-duration compute workloads.
For operational credibility and reliability, capacity is presented as bankable planning zones: a baseline block (Load A) can run efficiently at steady state, while a separate block (Load B) is designed for higher-density, SLA-aligned deployments. Open pads indicate reserve and expansion without overbuild.
Config: 13.8 kV · 60 Hz · OFF-GRID · 22.41 MVA @ PF~0.80
Choose the operating model that matches your deployment: tenant colocation, customer-owned pads, or dedicated hosting.
Infrastructure-first delivery: measurable capacity, metered energy, and operational control—built for long-duration compute.
Off-grid operation reduces dependency on public grid dynamics and enables controlled delivery planning.
Transparent metering supports reliable invoicing and operational reporting cadence for stakeholders.
Capacity scales via standard pods, blocks, and pad allocations—without redesigning the site each phase.
Defined access, acceptance, and maintenance windows protect stability and availability.
A practical path from baseline air cooling to high-density liquid deployments based on workload.
Clear access procedures and optional remote hands enable predictable operations across tenants.
The asset in figures
Eight gas engines, one 13.8 kV bus, three planning zones. The figures banks and authorities ask for first, in one view.
Energy flow · simplified one-line view
Fuel
Natural gas
Supplied to the on-site generation plant.
Generation
8 gas engine gensets
Reciprocating prime movers, 60 Hz.
Distribution
13.8 kV bus
Central medium-voltage switchgear lineup.
Load zones
Island mode: no connection to the public grid. Generation and load are balanced on site.
Source: Cottleone site specification · Status: November 2026. Simplified view for orientation; single-line diagrams and operating limits are provided in the data room.
Capacity allocation
Solid: lower boundLighter: planning rangeHatched: reserve
| Zone | Use | Planning range |
|---|---|---|
| Load A | Baseline, steady state | 8–10 MW IT |
| Load B | Flex, higher density, liquid-ready | 6–7 MW IT |
| Reserve | Headroom and expansion | ~1–2 MW |
| Total | Net deliverable (22.41 MVA × 0.80) | 17.93 MW |
Ranges are planning figures, not guaranteed maxima. The combined allocation of all zones never exceeds 17.93 MW net; deliverable IT load depends on workload mix and cooling design.
Source: Cottleone site specification · Status: November 2026.
Estimate potential earnings by inputting your hash rate or selecting a device. Compare profitability across ASIC, GPU, CPU, and AI Cloud rentals based on current market data and electricity costs.
A straightforward model built for predictable delivery: reserve capacity, meter energy, operate under clear standards.
Capacity is contracted as kW/MW blocks aligned to your deployment phases.
Energy is delivered and billed via metering, providing transparent reporting.
Deployment and access follow defined site rules to protect stability.
A controlled disclosure process. We share the right documents once access is approved.
Connection standards, acceptance checklist, and commissioning sequence.
Pod / Block / Campus tiers, rollout sequencing, and reservation model.
Metering structure, invoicing cadence, and transparency reporting format.
Access procedures, safety policy, and multi-tenant operating windows.
Direct gas-to-compute conversion active. Zero curtailment. Autonomous load balancing engaged.
Straight answers to the questions that matter for deployment planning, procurement, and operations.
Capacity is reserved as defined kW/MW blocks aligned to your rollout phases. This keeps planning auditable and avoids “best effort” delivery ambiguity.
Energy delivery is metered and reported on a consistent cadence. Billing is based on measured kWh with contract-defined reporting and invoicing terms.
We support a practical path from baseline air deployments to liquid-ready designs based on workload requirements and agreed standards.
Onboarding follows a defined acceptance and commissioning sequence: site standards review, interconnect checks, safety validation, then energization and steady-state operations.
Operational commitments are defined per product and deployment architecture. We focus on measurable capacity, clear governance, and predictable operating windows.
Expansion is designed to be modular: additional capacity blocks and pads can be added as your deployment grows, aligned to phased commissioning.
Tell us what you’re deploying. We’ll share availability, standards, and commercial structure through a controlled access process.