17.93 MW · ISLAND MODE
On-site gas generation delivering behind-the-meter capacity for compute deployments in the Permian Basin, Texas.
Gas → Power → Compute
Independent island-mode microgrid delivering reserved capacity blocks. Engineered for stability and operational transparency.
- Island-mode microgrid. ERCOT disconnected by design.
- Capacity delivered in 0.5 MW and 1.0 MW reserved blocks.
- capacity-first infrastructure with container-ready powered space.
Internal baseline operations: 2 MW · Remaining capacity available for customers.
Visual motion is intentionally calm and operational.
Infrastructure-first. Compute-ready.
Eight core platform pillars aligned to physical energy operations and contractual capacity delivery.
Infrastructure (Energy Asset)
8-unit Caterpillar fleet delivering deterministic on-site power.
Island Mode Microgrid
ERCOT disconnected. Controlled operation and visibility.
Behind-the-Meter Capacity Blocks
Reserve 0.5 MW or 1.0 MW blocks behind the meter.
Container Colocation (Powered Space)
Powered placement for customer containers and private deployments.
AI / HPC Workloads
Deterministic power positioning for long-running workloads.
Investors (KPIs + Data Room)
Utilization, contracted capacity, and expansion logic.
Engineered Energy Flow
Gas supply → engine generation → power bus → reserved capacity → customer deployments.
Live indicators are presented as operational estimates for visibility.
Reserve Capacity Blocks
Contractable behind-the-meter reserved capacity in 0.5 MW and 1.0 MW blocks. Enhanced option available.
0.5 MW Block
- Reserved behind-the-meter capacity
- Metering + monthly reporting
- Standard commissioning checklist
1.0 MW Block
- Primary contract unit for scaling deployments
- Island-mode operations positioning
- Reserved vs delivered visibility
Enhanced / Immersion-ready
- High-density readiness positioning
- Dedicated technical onboarding
- Engineering validation prior to energization
Reserved capacity is contractual. Delivered performance depends on configuration and operating conditions.
Profit Calculator
Model mining economics using a 1.0 MW reserved capacity baseline and your electricity rate.
- Baseline: 1.0 MW Reserved Capacity (Contracted)
- Availability target: 98.5%
- Pool fee default: 1.5% · Payout: FPPS
Calculator outputs are estimates only and not financial advice.
Deploy Your Way
Customer operated deployments or optional managed services. Capacity-first, infrastructure-led.
- Bring your container or hardware
- Run your own stack and monitoring
- Cottleone delivers reserved capacity + metering
- Remote hands available (optional)
- Managed operations by arrangement
- Enhanced / immersion-ready planning (optional)
Investor View
Asset-level visibility into contracted capacity, utilization, and operating targets.
Live Facility Console (Public)
Read-only aggregated metrics for transparency. No operational control is exposed.
Public console metrics are aggregated and informational. Availability targets are not guarantees.
Request Access
Capacity, investor, and operator access requests are reviewed and verified.